🔒
See all 7 photos
More
More
More
Photos unlocked ✓ Please follow us there too 😊
We regularly share new apartments and properties on Facebook.
Follow Da Nang Beachfront on Facebook →Vinhomes King Park - The First All-in-One Urban Area in Bắc Ninh
Bắc Ninh, Thành phố Bắc Ninh
6Beds60.00m²
Keep exploring
Real homes, selected for this listing
You may also like
About this property
**PROJECT OVERVIEW: VINHOMES KING PARK HÒA LONG**
Project Name: Vinhomes King Park
Location: Hòa Long, Bắc Ninh
Scale: 268.81 hectares
Total Investment: Approximately 41,271 billion VND
Population Capacity: About 31,444 - 33,000 people
Planning: 1/500
Amenities: 57 hectares of greenery, water bodies, and a regulating lake, plus 70.9 hectares dedicated to health and sports facilities.
All-in-One Ecosystem: Includes inter-level schools, clinics, community cultural centers, shopping centers, and more. - **PRODUCT STRUCTURE**
Townhouses: 3,870 units
Villas: 352 units
= Total: 4,222 low-rise units
Apartments: 8 buildings, with a maximum height of approximately 31 floors
Mixed-use services: 2 plots, with a maximum height of approximately 30 floors
Details:
- Zone A1: 1,556 townhouses + 4 mixed-use apartment buildings.
- Zone A2: 2,217 townhouses + 352 villas + 4 mixed-use apartment buildings, the largest low-rise area in the project.
- Zone A3: 97 townhouses + 2 mixed-use service plots.
The project is expected to offer two construction types:
- Shell construction - On-time handover: Expected delivery in December 2027.
- Extended construction period of 18 - 24 months: Handover around May 2029.
Planned loan support with interest rates for 18 - 24 months.
**TARGET CUSTOMERS:**
- Elite from craft villages: Đình Bảng, Đồng Kỵ, Từ Sơn, Ninh Hiệp
- High-level professionals from foreign direct investment (FDI) corporations
- Business owners in industrial zones in Bắc Ninh and Bắc Giang.
**THE PROJECT IS HIGHLY PROMISING AS BẮC NINH HAS BEEN APPROVED BY THE NATIONAL ASSEMBLY TO BECOME A CENTRAL-LEVEL CITY.**
For inquiries about the project, please contact Phú BĐS at 0833 527 *** for 24/7 consultation
Project Name: Vinhomes King Park
Location: Hòa Long, Bắc Ninh
Scale: 268.81 hectares
Total Investment: Approximately 41,271 billion VND
Population Capacity: About 31,444 - 33,000 people
Planning: 1/500
Amenities: 57 hectares of greenery, water bodies, and a regulating lake, plus 70.9 hectares dedicated to health and sports facilities.
All-in-One Ecosystem: Includes inter-level schools, clinics, community cultural centers, shopping centers, and more. - **PRODUCT STRUCTURE**
Townhouses: 3,870 units
Villas: 352 units
= Total: 4,222 low-rise units
Apartments: 8 buildings, with a maximum height of approximately 31 floors
Mixed-use services: 2 plots, with a maximum height of approximately 30 floors
Details:
- Zone A1: 1,556 townhouses + 4 mixed-use apartment buildings.
- Zone A2: 2,217 townhouses + 352 villas + 4 mixed-use apartment buildings, the largest low-rise area in the project.
- Zone A3: 97 townhouses + 2 mixed-use service plots.
The project is expected to offer two construction types:
- Shell construction - On-time handover: Expected delivery in December 2027.
- Extended construction period of 18 - 24 months: Handover around May 2029.
Planned loan support with interest rates for 18 - 24 months.
**TARGET CUSTOMERS:**
- Elite from craft villages: Đình Bảng, Đồng Kỵ, Từ Sơn, Ninh Hiệp
- High-level professionals from foreign direct investment (FDI) corporations
- Business owners in industrial zones in Bắc Ninh and Bắc Giang.
**THE PROJECT IS HIGHLY PROMISING AS BẮC NINH HAS BEEN APPROVED BY THE NATIONAL ASSEMBLY TO BECOME A CENTRAL-LEVEL CITY.**
For inquiries about the project, please contact Phú BĐS at 0833 527 *** for 24/7 consultation
Details
7.0B VND ≈ $275,100 USD| Property type | Căn hộ chung cư |
| Status | For Sale |
| Location | Bắc Ninh, Thành phố Bắc Ninh |
| Size | 60.00 |
| Bedrooms | 6 |
| Legal Type | Hợp đồng mua bán |